Paynhire

Construction works for the reconstruction and new construction of low...

Updated: March 02, 2024 03:57 PM GMT

Full-time Job in Lovech, Lovec


Electricity Networks West EAD

Electricity Networks West EAD

Lovech, Bulgaria

Construction and installation works for the reconstruction and new construction of low voltage air and cable networks with the removal of electricity measures at a property border, on the territory of Vratsa Municipality, Borovan Municipality and the Municipality of Mezdra, the implementation will start from the village.With the restoration of the pavement around the ladder and the transport of a dismantled pillar to a warehouse of ERM West EAD or to a depot – 55 pcs., Dismantling of a single AC or CU conductor, up to 95 mm² and transportation to the ERM West warehouse – 6 km, Dismantling of an existing electrometer single -phase – 1200 pcs.and three -phase – 300 pcs, dismantling of the switch single -phase (automatic or load) – 1200 pcs., installation of steel tube up to h = 7.5 m – 280 pcs, installation of reinforced concrete column 250/9.5 – 120 pcs., Installation of reinforced concrete pillar 590/9.5 – 60 pcs., Installation of reinforced concrete pillar 835/9.5 – 30 pcs.1500 pcs... More Detail


Apply Now

Companies Hiring in Lovech, Lovec


VOSS Automotive Bulgaria

VOSS Automotive Bulgaria

Energy Jobline

Energy Jobline

Teva Pharmaceuticals

Teva Pharmaceuticals

Electricity Networks West EAD

Electricity Networks West EAD

IMG ARENA

IMG ARENA

New Jobs Posted in Lovech, Lovec


Latest Jobs in Lovech, Lovec